Blue Nun...re-done Our family's suburban sailing adventures
  • Home
  • About
Homepage > fibreglass
August 17, 2017 In Upgrades

Anchor Locker Creation

One of the design flaws of the CS27 is that the anchor locker drains down under the v-berth, and that area isn’t connected to the bilge. The result is that any rainwater that gets in the locker, and all the water that drips off the anchor rode just sits under the v-berth, and has nowhere […]

Read More 0
img_0792.jpg
May 17, 2017 In Repairs

Keel Repairs

When we purchased Blue Nun, she came with a handy in-depth survey. It listed all the maintenance projects we should undertake and prioritized their urgency. One of the more intimidating items was an apparent and rusty crack in the back of the keel. Despite Les’ handyman abilities and Lindsay’s irritatingly sanguine, “how hard can it […]

Read More 2

Recent Posts

  • Bringing Blue Oak Home
  • Blue Nun is For Sale
  • Sailing in Croatia
  • Getting Certified on Georgian Bay
  • Let’s Sail the Mediterranean!

Recent Comments

  • Les on Adding a Clutch
  • Les on Keel Repairs
  • Irene on Adding a Clutch
  • Phil on Keel Repairs
  • joanne kennedy on Sailing in Croatia

Categories

  • Organization (1)
  • Repairs (1)
  • Trip Reports (3)
  • Uncategorised (2)
  • Upgrades (7)

Tags

bluenun cs27 fibreglass kids lesadmin offseason structural
Magazine WordPress Theme made by ThemeFuse